Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 6h)

10 unique locations (316 components)

Vacant land, Portsdown Technology Park, Southwick Rd, Portsmouth, Hampshire, PO6 3RU (5 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (14 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Ratcliffe Unit 1 coal-fired unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.69 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (19 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• EV charging at residential premises
Active • 2026-27 (T-4), 2025-26 (T-1) ...
76.74 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (30 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.42 MW
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (3 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Combined Cycle Gas Turbine plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
133 Balornock Road, Glasgow, G21 3UW (18 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Generators on hospital site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.41 MW
Loading map...
Showing 10 locations