10 unique locations (366 components)

Asda Meanwood, 34 Green Road , Leeds, LS6 4JP (12 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.82 MW
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (9 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
22.63 MW
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (30 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.42 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CMU comprising of battery storage and associated plant
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.46 MW
Land To The East Of Fire Station Green Lane Bishop Auckland DL14 6RS (7 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• a new build gas generating station
Active • 2025-26 (T-4), 2023-24 (T-4) ...
9.50 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
Vacant Land off Weighbridge Rd, Deeside, Flintshire, CH5 2LF (4 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution and gas network.
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2025-26 (T-4), 2021-22 (T-4)
Loading map...
Showing 10 locations