Storage (Duration 6h)

2 unique locations (163 components)

Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (9 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
22.63 MW
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW