Storage (Duration 8h)

2 unique locations (9 components)

Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (6 components)
• A Battery Energy Storage System.
• to be confirmed once the CMU components are known
Active • 2028-29 (T-4), 2026-27 (T-4) ...
140.24 MW
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (3 components)
• A Battery Energy Storage System.
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2028-29 (T-4), 2021-22 (T-4)
79.30 MW