Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 9h)

3 unique locations (35 components)

Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (3 components)

New build BESS to be installed within a future Greener Grid Park.

Not Prequalified B96
Inactive β€’
45.92 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (18 components)
β€’ Generating Unit 1
β€’ Generating Unit 2
IV2
Inactive β€’
603.34 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (14 components)
β€’ The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
β€’ The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Inactive β€’
34.61 MW
Loading map...
Showing 3 locations