Storage (Duration 9h)

4 unique locations (36 components)

Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (14 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Inactive •
34.61 MW
Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL (1 component)

Grid Scale Battery Energy Storage.

Not Prequalified CH5
Inactive •
7.25 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (18 components)
• Generating Unit 1
• Generating Unit 2
IV2
Inactive •
603.34 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (3 components)

New build BESS to be installed within a future Greener Grid Park.

Not Prequalified B96
Inactive •
45.92 MW