Storage (Duration 2h)

506 unique locations (1605 components) - Page 1 of 21

Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
10.47 MW
Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH. (1 component)

The CMU component consist of Li-ion (or equivalent) Battery Storage and Inverter units to be installed on designated land at Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH.

Active • 2027-28 (T-4)
5.54 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.56 MW
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
Wise Warren Farm, Warren Lane, Tadcaster, LS24 9NU (1 component)

A new-build energy storage site

Active • 2027-28 (T-4)
4.31 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
• Existing CMU comprising of battery storage and associated plant (2)
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.31 MW
Widow Hill, Balderstone Lane, Burnley, BB10 2TA (1 component)

70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.

Active • 2027-28 (T-4)
10.77 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Active • 2027-28 (T-4), 2024-25 (T-1)
1.99 MW
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.03 MW
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
West House Farm, Scruton, Northallerton, DL7 0RQ (1 component)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Active • 2028-29 (T-4)
3.77 MW
Westfield Road, Carlton, Wakefield, WF3 3RJ (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
10.45 MW
Welwyn Power, Tewin Road, Welwyn Garden City, AL7 1BH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
1.18 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Wansborough Paper Mill, Watchet, Somerset, TA23 0AY (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
1.64 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
31.34 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared …
Active • 2027-28 (T-4), 2025-26 (T-1)
14.67 MW
Uskmouth Power Station, West Nash Road, Newport, NP18 2BZ (2 components)

115MW battery energy storage system on a shared transmission connection

Active • 2028-29 (T-4)
16.12 MW
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (1 component)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Active • 2028-29 (T-4)
20.10 MW
Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-4)
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 25 locations