Displaying 1 - 50 of 7 matching companies (Page 1 of 21)
Marchwood CCGT
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network
A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered separately to the CHP
A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
A site with two gas engine CHPs, providing hot water to a local district heating network
A site with two gas engine CHPs providing hot water to a local district heating network
A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
District heating implementation with one asset 1MW and no auxiliary load
BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …
battery storage unit
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
Industrial load that is independently metered and controllable via SCADA. Load can be operated for 8+ hours.
Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …
1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
1.6MW Combined Heat and Power at International Conference Centre
Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
1.2 MW Combined Heat and Power Engine.
1.6 MW Combined Heat and Power Engine
Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …
2X gas reciprocating engines with a total gross power capacity of 3.973 MW
A distribution connected New Build Battery Energy Storage System
TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' …