Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

Active - 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Royle Farm Burton upon Trent Derbyshire DE15 9TU (1 components)

A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park

Active - 2025-26 (T-4)
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

28.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (4)

1.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4) (and 2 more)
Roundswell Business Park, Barnstable, Devon EX31 3TD (1 components)

Front of the Meter battery storage asset located in Devon.

Inactive - 2023-24 (T-1)
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
  • • 35.000MW battery energy storage system
  • • 35.000MW battery energy storage system.
  • • 49.990 MW battery energy storage system at Richborough Energy Park
  • • ... and 2 more unique descriptions
14.3 MW
Active - 2026-27 (T-4), 2025-26 (T-1) (and 2 more)
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
  • • 49.990 MW battery energy storage system
  • • Battery Energy Storage System
  • • battery energy storage system
6.1 MW
Active - 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
  • • A 49MW New Build Battery Storage Site. (3)
  • • A 34MW New Build Battery Storage Site.
  • • A 49MW existing Battery Storage Site.
Inactive - 2023-24 (T-4), 2022-23 (T-4) (and 4 more)
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
  • • Gas reciprocating engines as the generating unit. (2)
  • • Battery Storage Station
  • • Open cycle gas turbine as the generating unit.
68.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4) (and 1 more)
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
  • • 0.500MW Battery Energy Storage System (2)
  • • 0.5MW of demand reduction (2)
Active - 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Potmans Lane, Battle, TN33 9BL (6 components)

A Battery Energy Storage System (2)

Inactive - 2023-24 (T-4), 2022-23 (T-3)
Potman's Lane, Battle, TN33 9BL (5 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System, which has already PQ'd as POTM25
Active - 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Potash Farm, Nash Road, Beachampton, MK19 6EA (6 components)

49.900MW one-hour duration battery energy storage facility. (3)

Active - 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE (2 components)

New build one-hour duration storage to replace diesel plant (2)

1.4 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
20.5 MW
Active - 2026-27 (T-4), 2025-26 (T-1) (and 8 more)
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive - 2023-24 (T-4), 2022-23 (T-4)
Plot B at Severn Road Avonmouth BS10 7SE (7 components)
  • • 15.000MW of Battery Energy Storage Systems (2)
  • • 15MW of Battery Energy Storage Systems
  • • Existing Generator Battery Energy Storage System
  • • ... and 1 more unique descriptions
1.4 MW
Active - 2025-26 (T-4), 2025-26 (T-1) (and 5 more)
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (7 components)

Battery storage plant (4)

6.9 MW
Active - 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

1.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
  • • A Battery Energy Storage System (2)
  • • 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
Inactive - 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Perseverance Road, Hereford, UK, HR4 9SE (1 components)

A 8MW New Build Battery Storage Site

Inactive - 2022-23 (T-4)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (5)

1.3 MW
Inactive - 2023-24 (T-1), 2022-23 (T-1) (and 4 more)
Showing locations 51 - 75 of 299
Performance Metrics
Total Load Time

1.649s

Performance Breakdown
Company Search: 0.104s
Location Search: 0.369s
Pagination: 0.272s
Component Count: 0.241s

Optimized Direct LocationGroup Rendering

This search uses direct database objects without dictionary conversion, resulting in ~90% faster load times compared to the standard search.