Capacity Market Search

Displaying 1 - 2 of 14 matching companies

Component Results (2)

Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD

This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via …

ECOTRICITY (SMART GRID) LIMITED CMU: ALBESS Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.34 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD

This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via …

ECOTRICITY (SMART GRID) LIMITED CMU: ALBESS Storage (Duration 2h) CMU De-Rated N/A 2023-24 (T-1) One Year Ahead Capacity Auction