Capacity Market Search

Displaying items 1 - 4 of 4 matching components

Component Results (4)

3 Nutmeg Ln, London E14 2AX

Load reduction on site supported by non-exporting standby generation.

FLEXITRICITY LIMITED CMU: FLXT76 CMU De-Rated N/A 2020-21 (T-4) Four Year Ahead Capacity Auction
Location N/A

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

FLEXITRICITY LIMITED CMU: FLXT76 CMU De-Rated N/A 2020-21 (T-4) Four Year Ahead Capacity Auction
3 Nutmeg Ln, London E14 2AX

Load reduction on site supported by non-exporting standby generation.

FLEXITRICITY LIMITED CMU: FLXT76 CMU De-Rated N/A 2017-18 (T-1) One Year Ahead Capacity Auction
Location N/A

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

FLEXITRICITY LIMITED CMU: FLXT76 CMU De-Rated N/A 2017-18 (T-1) One Year Ahead Capacity Auction