Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Search Results for "PEAK GEN POWER 4 LIMITED"

73 unique locations (537 components) - Page 1 of 3

Brindley Road Cardiff CF11 8TL (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Inactive • 2021-22 (T-4), 2020-21 (T-4)
100 Montifichet Road, Westfield, Stratford E20 1GR (44 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.59 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (44 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.59 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (4 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.70 MW
4 Dewar Close Segensworth West Fareham Hampshire PO15 5UB (1 component)

A recently completed power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2017-18 (T-1)
BANKFIELD GROVE SCOT HAY NEWCASTLE STAFFORDSHIRE ST5 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Barnfield Road Swindon SN2 2DJ (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Inactive • 2021-22 (T-4), 2020-21 (T-4)
BARN HAY LANE RUGELEY STAFFORDSHIRE WS15 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.63 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (9 components)
• The CMU component is net of the auxiliary power required (2)
• A completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (2 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2025-26 (T-1)
3.47 MW
BATTERSEA POWER STATION LONDON SW11 8AH (8 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.19 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.67 MW
Bull Beggars Lane Berkhamsted HP4 2RS (1 component)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2017-18 (T-1)
BURY AVENUE HAYES MIDDLESEX UB4 (2 components)

EV charging at residential premises (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
CHARVILLE LANE HAYES MIDDLESEX UB4 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
COFELY Great Coates, Grimsby, DN31 2TT (56 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to … (3)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to … (2)
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
COFELY Great Coates, Grimsby, DN31 2TT (40 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to … (2)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
CRANBORNE WAYE HAYES MIDDLESEX UB4 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
CRANFORD LANE HARLINGTON HAYES MIDDLESEX UB3 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Engie Great Coates, Grimsby, DN31 2TT (28 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the … (5)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.05 MW
Engie Great Coates, Grimsby, DN31 2TT (21 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the … (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (9 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at … (2)
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
379.81 MW
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (29 components)
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is …
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is …
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
300.51 MW
Loading map...
Showing 25 locations