Capacity Market Search

Displaying items 1 - 1 of 1 matching components

Component Results (1)

South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPNW22 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 8.98 MW 2026-27 (T-4) Four Year Ahead Capacity Auction