Capacity Market Search

Displaying items 1 - 6 of 6 matching components

Component Results (6)

Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN002 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.57 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN002 Storage (Duration 1h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN002 Storage (Duration 1.5h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN002 Storage (Duration 1h) CMU De-Rated N/A 2023-24 (T-1) One Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN002 Storage (Duration 1.5h) CMU De-Rated N/A 2022-23 (T-1) One Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN002 Storage (Duration 1.5h) CMU De-Rated N/A 2021-22 (T-1) One Year Ahead Capacity Auction