Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU 5RES-4

15 unique locations - 6.4MW total capacity

195 Aylesone Rd, Leicester LE2 7QJ (33 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4.26 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (24 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
34.73 MW
2600 John Smith Drive, Oxford, OX4 2JY (37 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.87 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (36 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

DSR
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.87 MW
British Gas, New Bridge Ln, Stockport, SK1 2GT (14 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

DSR
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.10 MW
British Gas, New Bridge Ln, Stockport, SK1 2HQ (24 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

DSR
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.03 MW
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (16 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
236.25 MW
Cobden Street, Montrose, Angus, DD10 8EA (16 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.10 MW
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (30 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
15.24 MW
Harmire Road, Barnard Castle, County Durham, DL12 8D (11 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
1.61 MW
Loading map...
Showing 10 locations