CMU ADABS1

9 unique locations - 4.7MW total capacity

Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (1 component)

1.200MW of battery storage located at Durham.

DSR GSES 1 LIMITED Unproven DSR CMU
Inactive • 2020-21 (T-1)
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.69 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (3 components)

0.800MW of battery storage located at Wiltshire.

DSR GSES 1 LIMITED Unproven DSR CMU
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.65 MW
Carlton, Stockton-on-Tees, TS21 1EA (1 component)

1.200MW of battery storage located at Stockton-on-Tees.

DSR GSES 1 LIMITED Unproven DSR CMU
Inactive • 2020-21 (T-1)
Carlton, Stockton-on-Tees, TS21 1EA (8 components)
• 1.200MW of battery storage located at Stockton-on-Tees.
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.20 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (1 component)

1.200MW of battery storage located at Preston.

DSR GSES 1 LIMITED Unproven DSR CMU
Inactive • 2020-21 (T-1)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (20 components)
• 1.200MW of battery storage located at Preston.
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.21 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (1 component)

1.000MW of battery storage located at Staffordshire.

DSR GSES 1 LIMITED Unproven DSR CMU
Inactive • 2020-21 (T-1)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (10 components)
• 1.000MW of battery storage located at Staffordshire.
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
• Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.88 MW
Loading map...
Showing 9 locations