Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU ANC1B2

4 unique locations - 0.3MW total capacity

Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (20 components)
β€’ 1.200MW of battery storage located at Preston.
β€’ 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
β€’ Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
14.21 MW
Carlton, Stockton-on-Tees, TS21 1EA (8 components)
β€’ 1.200MW of battery storage located at Stockton-on-Tees.
β€’ 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
β€’ Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
6.20 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (7 components)
β€’ 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT
β€’ 1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT
β€’ Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1.22 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (10 components)
β€’ 1.200MW of battery storage located at Durham.
β€’ 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
β€’ Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
10.69 MW
Loading map...
Showing 4 locations