Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU AXP101

426 unique locations - 4.5MW total capacity

CM17 (21 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CM20 (5 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4)
CM21 (8 components)

Domestic EV charger (2)

DSR AXLE ENERGY LIMITED Proven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CM23 (83 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CM3 (65 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
CM4 (6 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4)
CM7 (31 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CM8 (24 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CO12 (13 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4)
CO5 (36 components)
• Domestic demand turn down (2)
• Domestic EV charger
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Loading map...
Showing 10 locations