Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU AXP103

704 unique locations - 146002.4MW total capacity

RM14 (21 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
149.24 MW
RH8 (14 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
117.94 MW
RH6 (35 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
309.72 MW
RH5 (14 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
132.97 MW
RH4 (8 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
96.83 MW
RH2 (28 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
375.24 MW
RH19 (31 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
301.16 MW
RH15 (31 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
109.56 MW
RH13 (40 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
404.69 MW
RH12 (102 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
324.89 MW
Loading map...
Showing 10 locations