CMU AXP203

733 unique locations - 139122.1MW total capacity

PE33 (6 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
92.30 MW
PE34 (12 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1)
82.72 MW
PE36 (2 components)
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1)
20.00 MW
PE6 (43 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
310.07 MW
PE7 (49 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
298.61 MW
PE9 (47 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
344.88 MW
PH16 (6 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
71.68 MW
PH2 (26 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
279.22 MW
PH26 (2 components)

Domestic EV charger

DSR AXLE ENERGY LIMITED Proven DSR CMU
Active β€’ 2025-26 (T-4)
8.22 MW
PL12 (14 components)
β€’ Domestic EV
β€’ Domestic EV charge point
β€’ Domestic EV charger
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
78.01 MW
Loading map...
Showing 10 locations