CMU AXP203

733 unique locations - 139122.1MW total capacity

DN9 (20 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
255.37 MW
DN5 (29 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
286.85 MW
DN41 (10 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
40.25 MW
DN38 (3 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1)
20.00 MW
DN36 (19 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
249.66 MW
DN35 (8 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
67.74 MW
DN32 (4 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1)
79.94 MW
DN3 (25 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
144.58 MW
DN22 (45 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
344.73 MW
DN20 (21 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
205.36 MW
Loading map...
Showing 10 locations