Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU AXP301

643 unique locations - 41280.9MW total capacity

PL28 (20 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
PL26 (31 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
107.17 MW
PL24 (9 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
PL2 (17 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
PH1 (24 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.32 MW
PE8 (35 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
82.92 MW
PE7 (52 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2025-26 (T-1) ...
178.03 MW
PE6 (75 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
243.51 MW
PE34 (19 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.02 MW
PE32 (18 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
Loading map...
Showing 10 locations