CMU AXP700

704 unique locations - 68592.4MW total capacity

PR4 (69 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
200.48 MW
PR3 (53 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
219.02 MW
PO9 (42 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
123.57 MW
PO8 (48 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
194.03 MW
PO7 (40 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
109.92 MW
PO4 (10 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
25.64 MW
PO38 (14 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
40.04 MW
PO36 (21 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
56.37 MW
PO35 (12 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
35.25 MW
PO22 (18 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
63.80 MW
Loading map...
Showing 10 locations