CMU BBT4U6

6 unique locations - 0.3MW total capacity

Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Sewage Treatment Works, Lawford Lane, Writtle CM1 3EW (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU
Active • 2028-29 (T-4)
0.06 MW
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
A Pumping Station On The North East Side Of Pigeon Lane Fornham All Saints IP28 6JP (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU
Active • 2028-29 (T-4)
0.05 MW
Loading map...
Showing 6 locations