CMU Cavrd3

3 unique locations - 7.6MW total capacity

Cavendish Rd Stevenage SG1 2ET UK (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (70 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5 under the BSC. The metering for this unit is an aggregation of GEN5 and UT5.The net output of the CMU component will be the metered output for T_DRAXX-5 less the auxiliary load.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. The metering for this unit is an aggregation of GEN6 and UT6.The net output of the CMU component will be the metered output for T_DRAXX-6 less the auxiliary load.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
978.15 MW
Sellindge Convertor Station, Church Lane, Sellindge, Ashford, TN25 6AF (14 components)
• Interconnexion France Angleterre (IFA) 2,000MW high voltage direct current link between the French and GB transmission systems.
• Interconnexion France Angleterre (IFA) 1988MW (TEC) high voltage direct current link between the French and GB transmission systems.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 3 locations