Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU FLXR82

300 unique locations - 21.9MW total capacity

ASDA Swanley, London Road, Swanley, BR8 7UN (17 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
ASDA Swansea, Upper Forest Way, Morriston, SA6 8PS (17 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
13.36 MW
ASDA Swindon Haydon, Orbital Shopping Park Thamesdown Drive, Swindon, SN25 4YX (18 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
ASDA Walton, Utting Avenue , Liverpool, L4 9XU (18 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
ASDA Waterlooville, Portland Road , Waterlooville, PO7 7XR (18 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
ASDA Watford, Odhams Industrial Estate , Watford, WD24 7RT (18 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
ASDA Wheatley, London Road, Oxford, OX33 1YZ (18 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
ASDA Woking Sheerwater, Forsyth Road Sheerwater, Woking, GU21 5SE (17 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.57 MW
Asda Worsbrough, Thomas Street , Worsbrough, S705AU (15 components)
• Load curtailment
• Load curtailment from refridgeration
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.08 MW
ASDA Wrexham, Holt Road, Wrexham, LL13 8HL (18 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
Loading map...
Showing 10 locations