CMU LEVC01

720 unique locations - 8.2MW total capacity

WS5 (15 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
WS9 (18 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
WV10 (19 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
WV12 (13 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
WV2 (2 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
DSR LEVELISE LIMITED Proven DSR CMU Unproven DSR CMU
Active • 2025-26 (T-1)
WV4 (14 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
WV6 (30 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
WV9 (3 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2024-25 (T-1)
YO10 (7 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2024-25 (T-1)
YO11 (6 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1)