Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU NBB_10

4 unique locations

Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (7 components)
β€’ 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT
β€’ 1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT
β€’ Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1.22 MW
Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT (2 components)

1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT (2)

Battery Storage LIMEJUMP LTD New Build Generating CMU
Inactive β€’ 2020-21 (T-4), 2017-18 (T-1)
Carlton, Stockton-On-Tees, TS21 1EA (2 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA

Inactive β€’ 2020-21 (T-4), 2017-18 (T-1)
Carlton,Stockton-On-Tees,TS21 1EA (2 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA (2)

Battery Storage LIMEJUMP LTD New Build Generating CMU
Inactive β€’ 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 4 locations