Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU OCTE31

2381 unique locations - 39.9MW total capacity

TF10 (941 components)
• Domestic demand turn down (2)
• Domestic EV charger
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TF1 (1143 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TD8 (60 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TD7 (78 components)

Domestic demand turn down (2)

DSR POD POINT LIMITED Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TD6 (214 components)
• Domestic EV charger
• Domestic demand turn down
DSR POD POINT LIMITED Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TD5 (186 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TD4 (38 components)

Domestic demand turn down

DSR POD POINT LIMITED Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TD3 (26 components)

Domestic demand turn down

DSR OCTOPUS ENERGY LIMITED Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TD2 (130 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TD15 (282 components)
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 10 locations