CMU OCTE42

734 unique locations - 20.0MW total capacity

NN11 (28 components)
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
323.85 MW
NN13 (23 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
230.67 MW
NN15 (49 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
411.69 MW
NN16 (15 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
146.76 MW
NN3 (48 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
303.29 MW
NN4 (48 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
371.49 MW
NN5 (28 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
137.13 MW
NN6 (60 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
445.83 MW
NN9 (18 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1)
105.33 MW
NP11 (13 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
170.23 MW