CMU OCTE43

736 unique locations - 20.0MW total capacity

PL19 (9 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
39.87 MW
PL2 (11 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
116.14 MW
PL20 (3 components)

Domestic demand turn down

DSR OCTOPUS ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-1), 2024-25 (T-1)
69.51 MW
PL21 (18 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
210.18 MW
PL7 (28 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
176.92 MW
PL8 (9 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1)
49.27 MW
PO11 (19 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
230.72 MW
PO12 (16 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
226.57 MW
PO14 (23 components)
β€’ Domestic EV
β€’ Domestic EV charge point
β€’ Domestic EV charger
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
227.17 MW
PO15 (30 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
263.41 MW