Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU OCTE43

736 unique locations - 20.0MW total capacity

BH15 (19 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BH20 (16 components)
• Domestic demand turn down (2)
• Domestic EV charger
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BH22 (23 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BH24 (26 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BH25 (14 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BH6 (20 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2024-25 (T-1)
BH7 (9 components)
• Domestic demand turn down (2)
• Domestic EV charger
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BL0 (8 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4)
BL1 (31 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BL2 (24 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Loading map...
Showing 10 locations