724 unique locations - 20.0MW total capacity

PO32 (1 component)

Domestic demand turn down

DSR OCTOPUS ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-1)
20.00 MW
PO6 (25 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
316.40 MW
PO8 (32 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
338.40 MW
PO9 (36 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
258.67 MW
PR1 (25 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
256.42 MW
PR7 (61 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
412.09 MW
RG10 (27 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
312.78 MW
RG12 (39 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
312.13 MW
RG19 (16 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
71.89 MW
RG2 (46 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
407.13 MW
Loading map...
Showing 10 locations