CMU PG1826

3 unique locations - 5.9MW total capacity

Land North of Clayhill Farm, Westoning MK45 5JD (6 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.30 MW
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (9 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.54 MW
Nunhide Lane Theale Berkshire RG31 7SD (1 component)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4)