Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU SELBY_

5 unique locations - 18.9MW total capacity

Drax Power Station Drax Selby YO8 8PH (5 components)
• Unit 1 fuelled by Biomass at Drax Power Station
• Unit 2 fuelled by Biomass at Drax Power Station
• Unit 3 fuelled by Biomass at Drax Power Station
Active • 2028-29 (T-4), 2021-22 (T-4)
2238.05 MW
Lochaber Smelter Fort William Scotland PH33 6TH (12 components)
• Furnace
• Furnaces
Active • 2025-26 (T-1), 2024-25 (T-1) ...
30.00 MW
MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
21.63 MW
Padeswood Works, Chester Road, Padeswood, Mold, CH7 4HB (5 components)
• Energy from waste Facility
• Onsite demand reduction and load shifting at cement works
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Shaw House Farm, Clitheroe Road, Whalley, Clitheroe, BB7 9AD (6 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• Water treatment centre
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 5 locations