CMU SELBY_

14 unique locations - 18.9MW total capacity

Unit 23 B, South Gyle Crescent, Edinburgh, EH12 9EQ (3 components)
• Battery Energy Storage System
• Ratcliffe Unit 4 coal-fired unit
Inactive • 2022-23 (T-3), 2021-22 (T-4)
MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
21.63 MW
Manchester Rd, Carrington, Manchester M31 4TG (33 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
12.59 MW
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.78 MW
Land at Kilbuck Lane, Haydock Cross Industrial Estate, St. Helens, WA11 9SR (6 components)
• A new build gas fuelled generating plant at Haydock Cross Industrial Estate, WA11 9SR
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (30 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.42 MW
Grimethorpe CMM Generation Plant, Springvale Road, Grimethorpe S72 7BF (6 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 10 locations