Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU SELBY_

19 unique locations - 18.9MW total capacity

35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)
• On-site existing CHP generating unit
• The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready for lay-down, connection to the sub-station, testing and commissioning.
Active • 2024-25 (T-4), 2022-23 (T-4)
54.62 MW
Chenhalls Road St Erth Hale Cornwall TR27 6LA (3 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cobden Street, Montrose, Angus, DD10 8EA (16 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.39 MW
EcoPark, Advent Way, Edmonton, London N18 3AG (15 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.

Active • 2025-26 (T-1), 2022-23 (T-4) ...
17.61 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (9 components)
• 1 x hydro turbine & synchronous generator
• EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• Enfield CCGT Power Station - (one unit station)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
678.53 MW
Grimethorpe CMM Generation Plant, Springvale Road, Grimethorpe S72 7BF (6 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Kilbuck Lane, Haydock Cross Industrial Estate, St. Helens, WA11 9SR (6 components)
• A new build gas fuelled generating plant at Haydock Cross Industrial Estate, WA11 9SR
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (4 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 10 locations