Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU SELBY_

19 unique locations - 18.9MW total capacity

Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (15 components)
• Component has yet to be procured.
• New build gas generator
• Operational reciprocating gas engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.06 MW
The Bath Inn, Wheldon Road, Castleford WF10 2RY (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Shaw House Farm, Clitheroe Road, Whalley, Clitheroe, BB7 9AD (6 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• Water treatment centre
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Priory Street, Ware, Hertfordshire, SG12 0DJ (14 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2021-22 (T-1) ...
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (4 components)
• CHP Plant
• The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
183.24 MW
Manchester Rd, Carrington, Manchester M31 4TG (33 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
12.59 MW
Lochaber Smelter Fort William Scotland PH33 6TH (12 components)
• Furnace
• Furnaces
Active • 2025-26 (T-1), 2024-25 (T-1) ...
30.00 MW
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (4 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 10 locations