CMU SELBY_

10 unique locations - 18.9MW total capacity

35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)
• On-site existing CHP generating unit
• The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready for lay-down, connection to the sub-station, testing and commissioning.
Active • 2024-25 (T-4), 2022-23 (T-4)
Cobden Street, Montrose, Angus, DD10 8EA (16 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.39 MW
Denison road, Selby, North Yorkshire, YO8 8AN. (10 components)

Gas Turbine Cogeneration Unit GT3

Active • 2026-27 (T-4), 2024-25 (T-4) ...
65.83 MW
Denison Road, Selby, North Yorkshire YO8 8AN (19 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2024-25 (T-4), 2023-24 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (30 components)
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH01 consists of one CHP engine supplying heat, CO2 and power to the on site Nursery.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.49 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (25 components)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Redditch 20MW Gas Peaker Project
Active • 2028-29 (T-4), 2026-27 (T-4) ...
27.74 MW
Olympia Mills, Barlby Rd, Selby YO8 5AF multisite (5 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• On-site existing CHP generating unit
Active • 2024-25 (T-4), 2023-24 (T-1)
41.39 MW
6050.24 MW
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
80.18 MW
Loading map...
Showing 10 locations