CMU SELBY_

10 unique locations - 18.9MW total capacity

Durham Road, Chester-Le-Street DH3 2AH, United Kingdom (19 components)
• A gas fuelled generating station.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.15 MW
EDF Energy, Hinkley Point B power station, Nr Bridgwater, Somerset, TA5 1UD (56 components)
• Hinkley Point B Power Station CMU 7: [HP7-22] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 7: [HP7-23] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 8: [HP8-23] T_HINB-8 + (50% x T_HINB-D)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1771.09 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (30 components)
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH01 consists of one CHP engine supplying heat, CO2 and power to the on site Nursery.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.49 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.23 MW
Land at The Magazine, Hull Road, Selby, YO8 5BJ (23 components)
• 10 Gas reciprocating engines use for power generation with associated infrastructure
• Battery energy storage unit
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
26.22 MW
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (43 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
78.70 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW
6050.24 MW
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (15 components)
• Component has yet to be procured.
• New build gas generator
• Operational reciprocating gas engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.06 MW
Loading map...