Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU SELBY_

118 unique locations - 18.9MW total capacity

Shaw House Farm, Clitheroe Road, Whalley, Clitheroe, BB7 9AD (6 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• Water treatment centre
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Sherwood Drive Thorpe Willoughby Selby North Yorkshire YO8 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
151.26 MW
Spring Walk, Brayton, Selby, North Yorkshire, YO8 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
18.91 MW
Spring Walk Selby North Yorkshire YO8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
170.17 MW
Stagecoach Guildford, Peasmarsh, Guildford, GU3 1LZ (12 components)
• 390kW Battery Storage located at Stagecoach Guildford depot
• Genset 2
• New build battery
Active • 2026-27 (T-4), 2023-24 (T-1) ...
41.41 MW
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
80.18 MW
The Bath Inn, Wheldon Road, Castleford WF10 2RY (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
The Green, Wistow, Selby, North Yorkshire , YO8 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
37.82 MW
The Ridgeway Enfield, Middlesex EN2 8JL (5 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.03 MW
Loading map...
Showing 10 locations