Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU SELBY_

118 unique locations - 18.9MW total capacity

Main Road, North Yorkshire, Selby, YO8 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
18.91 MW
Manchester Rd, Carrington, Manchester M31 4TG (33 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
12.59 MW
Mayfield Drive Brayton Selby YO8 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
151.26 MW
MEADOW VIEW THORGANBY SELBY YO19 (9 components)

EV charging at residential premises

Active • 2026-27 (T-4), 2024-25 (T-1) ...
132.36 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2527.80 MW
MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
21.63 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (4 components)
• CHP Plant
• The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
183.24 MW
MYRTLE AVENUE SELBY YO8 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
37.82 MW
Netherlands Way Stallingborough Grimsby DN41 8DT (1 component)

50 MW Storage facility located at Stallingborough, Grimsby.

Inactive • 2021-22 (T-4)
Loading map...
Showing 10 locations