Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU SELBY_

118 unique locations - 18.9MW total capacity

New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (43 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
78.70 MW
North Dean Business Park, Stainland Road, Halifax, HX4 8LR (5 components)

Diesel and/or gas reciprocating engines.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
OAK FIELD BRAYTON SELBY YO8 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
132.36 MW
OAKLANDS CAMBLESFORTH SELBY YO8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
170.17 MW
Oakley Gardens Milton Keynes Buckinghamshire MK15 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.00 MW
OLD BANWELL ROAD, LOCKING, WESTON-SUPER-MARE, BS24 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
113.45 MW
Olympia Mills, Barlby Rd, Selby YO8 5AF multisite (5 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• On-site existing CHP generating unit
Active • 2024-25 (T-4), 2023-24 (T-1)
41.39 MW
Olympia Mills, Barlby Rd, Selby YO8 5AF, United Kingdom (9 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
75.66 MW
OUSEGATE SELBY YO8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
170.17 MW
Padeswood Works, Chester Road, Padeswood, Mold, CH7 4HB (5 components)
• Energy from waste Facility
• Onsite demand reduction and load shifting at cement works
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 10 locations