Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

AXLE ENERGY LIMITED

2408 unique locations (57912 components) - Page 54 of 97

Active MW: 260.05 MW
Inactive MW: 13.73 MW
L13 (6 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-1) ...
3.52 MW
L12 (10 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
4.48 MW
L11 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.03 MW
L10 (8 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
KY9 (5 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4)
4.48 MW
KY8 (8 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-1) ...
3.52 MW
KY7 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
3.52 MW
KY6 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.55 MW
KY5 (7 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.52 MW
KY4 (23 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.39 MW
KY3 (20 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-1) ...
3.52 MW
KY2 (20 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.39 MW
KY16 (25 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
7.38 MW
KY15 (26 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.38 MW
KY14 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-1) ...
3.52 MW
KY13 (41 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
14.98 MW
KY12 (40 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
11.87 MW
KY11 (97 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
7.38 MW
KY10 (14 components)

Domestic EV charger

Active • 2024-25 (T-1), 2024-25 (T-4)
3.52 MW
KY1 (15 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.59 MW
KW9 (2 components)

Domestic EV charger

Active • 2024-25 (T-1), 2024-25 (T-4)
3.52 MW
KW8 (1 component)

Domestic EV charger

Active • 2024-25 (T-4)
0.03 MW
KW3 (1 component)

Domestic EV charger

Active • 2025-26 (T-4)
7.59 MW
KW17 (27 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.48 MW
KW16 (27 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-1) ...
7.39 MW
Loading map...
Showing 25 locations