Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Centrica Business Solutions UK Optimisation Limite

14 unique locations (542 components)

Active MW: 15.32 MW
Inactive MW: 0.00 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (22 components)
• Gas Turbine CHP GT001B (2)
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (2 components)

Turbo Expander - for pressure reduction of incoming natural gas (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (1 component)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2021-22 (T-4)
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (5 components)
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2 (2)
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cleckheaton Road, Low Moor Bradford BD12 0JZ (3 components)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe) BABR-1_1 (2)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe)
CHP and autogeneration Centrica Business Solutions UK Optimisation Limite EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +1 more BD12
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (5 components)
• Steam Turbine (2)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Denison Road, Selby, North Yorkshire YO8 8AN (6 components)
• One 8 MWe Gas Turbine Cogeneration Unit (GT2) (2)
• Gas Turbine Cogeneration Unit
Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (31 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Edgabaston, Birmingham, West Midlands, B15 2TT (16 components)
• Gas Engine
• Gas engine
• Gas turbine generator
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Kemsley Mill, SittingBourne, Kent, ME10 2TD (3 components)
• One 40MWe gas Turbine Generation unit (2)
• One 40MWe gas Turbine Generation unit which is part of the Kemsley 1 CHP Plant
CHP and autogeneration Centrica Business Solutions UK Optimisation Limite EA 17/18 REST05 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +1 more ME10
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (3 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
N/A (442 components) Geocoding Needed
• DSR components shall be assigned prior to the start of the Delivery Year.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
• bus depot site
DSR EDF ENERGY CUSTOMERS LIMITED E.ON UK PLC ZENOBE RENTAL 12 LIMITED +8 more CMU_GE_DSR1 DSRUNP(MIX) +286 more
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Steel House, Redcar, TS10 5QW (1 component)

Diesel 6MW

Inactive • 2016-17 (TR)
Loading map...
Showing 14 locations