{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Centrica Business Solutions UK Optimisation Limite

10 unique locations (74 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (2 components)

Turbo Expander - for pressure reduction of incoming natural gas (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (1 component)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2021-22 (T-4)
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (5 components)
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2 (2)
• Gas turbine generator 6.4MWe CHP BABR-1
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cleckheaton Road, Low Moor Bradford BD12 0JZ (3 components)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe) BABR-1_1 (2)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe)
CHP and autogeneration Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +1 more BD12
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (5 components)
• Steam Turbine (2)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST03 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Denison Road, Selby, North Yorkshire YO8 8AN (6 components)
• One 8 MWe Gas Turbine Cogeneration Unit (GT2) (2)
• Gas Turbine Cogeneration Unit
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU New Build Generating CMU EA 17/18 REST04 REST04 +3 more YO8
Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (31 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST07 EA 17/18 REST08 +14 more DN40
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Edgabaston, Birmingham, West Midlands, B15 2TT (16 components)
• Gas Engine
• Gas engine
• Gas turbine generator
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST01 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more B15
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Kemsley Mill, SittingBourne, Kent, ME10 2TD (3 components)
• One 40MWe gas Turbine Generation unit (2)
• One 40MWe gas Turbine Generation unit which is part of the Kemsley 1 CHP Plant
CHP and autogeneration Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST05 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +1 more ME10
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Loading map...
Showing 10 locations