{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Dockside Power Limited

14 unique locations (47 components)

Active MW: 0.00 MW
Inactive MW: 19.60 MW
5 Mile Drive, Northwick, GL56 9TR (4 components)

Reciprocating engines (3)

Reciprocating Engines Dockside Power Limited Existing Generating CMU New Build Generating CMU Northwick Northwick +1 more GL56
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Broad Lane, Harts Hill (Wasing Estate) Generation, Thatcham, Newbury, RG7 6SX (3 components)

gas fired reciprocating engines

Reciprocating Engines Dockside Power Limited New Build Generating CMU Hartshill A Hartshill B +1 more Not Prequalified RG7
Inactive • 2020-21 (T-4)
Dockside Rd, Middlesbrough, TS3 8AT (2 components)

Gas Fired Reciprocating engines

Reciprocating Engines Dockside Power Limited New Build Generating CMU Dockside A Dockside B TS3
Inactive • 2020-21 (T-4)
Faraday Road, Plymouth, PL4 0ST (4 components)
• Gas fired reciprocating engines. (2)
• Reciprocating Engines
Reciprocating Engines Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) PULSE CLEAN ENERGY UK LIMITED Existing Generating CMU New Build Generating CMU DG002 Plymouth G +1 more Not Prequalified PL4
Active • 2024-25 (T-4), 2021-22 (T-4) ...
Greenfield Road, Bedford MK45 5JD (2 components)

gas fired reciprocating engines

Reciprocating Engines Dockside Power Limited New Build Generating CMU Westoning Rd A Westoning Rd B Not Prequalified MK45
Inactive • 2020-21 (T-4)
Harts Farm Way, Havant, PO9 1HS (3 components)
• Gas fired reciprocating engines
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
M65, Accrington BB5 5WE (4 components)
• gas fired reciprocating engines (2)
• Gas fired reciprocating engines.
Active • 2024-25 (T-1), 2020-21 (T-4) ...
Main Ave, Hirwaun, CF44 9UY (5 components)
• Additional capacity alongside the long term STOR at Hirwaun & Dowlais. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. (2)
• Reciprocating engines
Reciprocating Engines Dockside Power Limited Existing Generating CMU Hirwaun Hirwaun +1 more CF44
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Manchester, Bolton & Bury Canal Towpath, Clifton, Manchester M27 8LR (3 components)
• gas fired reciprocating engines (2)
• Gas fired reciprocating engines.
Reciprocating Engines Reciprocating engines Dockside Power Limited New Build Generating CMU Rake Lane Rake Lane M27
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Pengarnddu Ind Est, Dowlais Top, Merthyr Tydfil, CF48 2TA (4 components)
• Reciprocating Engines (2)
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Reciprocating Engines Viridis 178 Limited Existing Generating CMU New Build Generating CMU Dowlais Dowlais +1 more CF48
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Seagrave Grange, Loughborough, Leicestershire, LE12 7BG (1 component)

Gas fired reciprocating engines

Reciprocating Engines Dockside Power Limited New Build Generating CMU Big Lane LE12
Inactive • 2020-21 (T-4)
Titanium Rd, Swansea, SA5 4SF (3 components)

Reciprocating engines (3)

Reciprocating Engines Dockside Power Limited Existing Generating CMU Swansea Swansea SA5
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
West Thorpe, Willoughby on the Wolds, LE12 6TD (5 components)
• Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone was been completed before the previous auction. (2)
• Reciprocating engines
Reciprocating Engines Dockside Power Limited Existing Generating CMU New Build Generating CMU Willoughby Willoughby +1 more LE12
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
West Yelland, Yelland, EX31 3HB (4 components)

Reciprocating Engines (2)

Reciprocating Engines Dockside Power Limited New Build Generating CMU Yelland A Yelland B Not Prequalified EX31
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 14 locations