Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENSO GREEN HOLDINGS LIMITED

16 unique locations (22 components)

Active MW: 245.28 MW
Inactive MW: 0.00 MW
Barleylands Barleylands Road Billericay Essex CM11 2UD (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
Denmead Farm Edneys Lane Denmead Waterlooville Hampshire PO7 6JN (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
Land at Impens Farm, Petherton Road, North Newton, Bridgwater, Somerset, TA7 0BB (2 components)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
Land At Warren Farm High Street Dunsville Doncaster DN7 4BT (1 component)

A battery energy storage system

Active • 2028-29 (T-4)
LAND EAST AND WEST OF HONILEY ROAD (A4177), HONILEY, KENILWORTH, WARWICKSHIRE (1 component) Geocoding Needed

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
Land north of Butterfly Lane, land surrounding Hilfield Farm and land west of Hilfield Lane, Aldenham, near WD25 8DD (1 component)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2027-28 (T-4)
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (1 component)

A 46.000 MW / 69.00 MWh battery energy storage system

Active • 2027-28 (T-4)
Land South of Church Farm, Somersham, IP8 4PN and Land East of The Channel, Burstalhill, IP8 4JL (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (2 components)

A 100.000 MW / 150.000 MWh battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
Land South Of Marsh Farm Marsh Lane Fobbing Essex SS17 9JW (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
Land south of Southlands Cottages Runwell Road Runwell Wickford Essex SS11 7QH (1 component)

A 47.500 MW / 71.250 MWh battery energy storage system

Active • 2027-28 (T-4)
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER (2 components)
• A 110.000 MW / 165.000 MWh battery energy storage system
• A 120.000 MW / 180.000 MWh battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4)
Land to the west of Pound Road, Axminster EX135UP (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED AXMINSTER Axminster - Pound Rd Not Prequalified EX13
Active • 2027-28 (T-4), 2026-27 (T-4)
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
Minchens Lane Bramley RG7 2NL (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
Loading map...
Showing 16 locations