Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

31 unique locations (101 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (4 components) Geocoding Needed

3 x 1.6MW POSGU (standby generation)

DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX62 FLEX62 TN14
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
R&H Holt, Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (2 components) Geocoding Needed

One CHP of 1.0MW. Primary fuel type = Natural Gas

Reciprocating Engines FLEXITRICITY LIMITED Existing Generating CMU FLEX22 WR11
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Pudding Lane Spalding, Lincs, PE11 3TJ (5 components) Geocoding Needed
• Load curtailment and standby generation
• Load curtailment via standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Pudding Lane Spalding, Lincs, PE11 3TJ (5 components)
• Load curtailment via standby generation (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +2 more PE11
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Portsmouth Rd, Frimley, Surrey GU16 7UJ (5 components) Geocoding Needed
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• Standby generation
• Standby generation sub-metered taking site load
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Portsmouth Rd, Frimley, Surrey GU16 7UJ (5 components)
• Standby generation sub-metered taking site load (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +2 more GU16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Pipers Way, Swindon, Wiltshire, SN38 1SN (4 components) Geocoding Needed
• Load curtailment & standby generation
• Load reduction via on-site standby generation taking site load
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +1 more SN38
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Park Lane Cottingham East Yorkshire HU16 5RX (2 components) Geocoding Needed

Gas CHP engines in commercial horticultural environment with one 1.3MW engine and one 1.5MW engine plus two 0.95MW gas CHP. Primary fuel type = Natural Gas. No auxilliary load

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Monument Road, Bicker, Lincolnshire PE20 3DJ (4 components) Geocoding Needed
• Load curtailment and standby generation
• Load curtailment at site via standby generation
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +1 more PE20
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Knypersley Generator Unit G Forge Way Brownlees Industrial Estate Knypersley Stoke on Trent ST8 7DN (2 components) Geocoding Needed

Four reciprocating engines 1.7MW and one of 1.6MW capacity. Primary fuel - gasoil

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Knypersley Generator Unit G Forge Way Brownlees Industrial Estate Knypersley Stoke on Trent ST8 7DN (2 components)

Four reciprocating engines 1.7MW and one of 1.6MW capacity. Primary fuel - gasoil (2)

Reciprocating Engines FLEXITRICITY LIMITED Existing Generating CMU FLEX16 ST8
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Kings Park Road, Moulton Park, Northampton, NN3 6NW (4 components) Geocoding Needed
• Load curtailment on site and standby generation
• Load reduction on site via standby generation
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +1 more NN3
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Holditch Power Station Holditch Road Lymedale Business Park Newcastle under Lyme ST5 9JA (2 components) Geocoding Needed

Three reciprocating engines each with 2.66MW capacity. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Holditch Power Station Holditch Road Lymedale Business Park Newcastle under Lyme ST5 9JA (2 components)

Three reciprocating engines each with 2.66MW capacity. Primary fuel type = Natural Gas (2)

Reciprocating Engines FLEXITRICITY LIMITED Existing Generating CMU FLEX15 ST5
Inactive • 2020-21 (T-4), 2017-18 (T-1)
High Street Waterham Kent ME13 9EJ (2 components) Geocoding Needed

6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
High Street Waterham Kent ME13 9EJ (2 components)

6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas (2)

Reciprocating Engines FLEXITRICITY LIMITED Existing Generating CMU FLEX01 ME13
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Harbour House, Marine Parade Dover Kent CT17 9BU (3 components) Geocoding Needed
• Multiple POSGUs (standby diesel generators).
• Sixteen POSGUs (standby diesel generators).
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX40 FLEX40 CT17
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Gogar Station Road, Gogarburn Edinburgh EH12 1HQ (2 components) Geocoding Needed

Four POSGUs (standby diesel generators) each having 1.4MW capacity.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
entre Bailey Road, Central Park, Rugby CV23 0PD (3 components) Geocoding Needed
• Load curtailment & standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (8 components) Geocoding Needed
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Dunswell Road, Cottingham, Hull HU16 4JT (2 components) Geocoding Needed

Two CHP engines, 1.94MW and 1.46MW (total 3.4MW) in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Dock Yard Rd, Ellesmere Port, CH65 4EG (6 components) Geocoding Needed
• BtM storage as standby generation, non-exporting
• BtM storage providing standby capacity
• BtM storage/standby generation; non exporting
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX72 FLEX72 +2 more CH65
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Combe Park, Bath, BA1 3NG (4 components) Geocoding Needed
• Standby generation taking site load
• Standby generation x 2
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +1 more BA1
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Chilham MCC, Mill Lane, Chilham, Kent CT4 8EF (2 components) Geocoding Needed

Standby generation

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Building 8, Chiswick Park, 566 Chiswick High Road, London W4 5XU (2 components) Geocoding Needed

Standby generation

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 25 locations