GSES 1 LIMITED
27 unique locations (45 components) - Page 1 of 2
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (2 components)
20.000 MW of battery storage located at Macclesfield. (2)
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (2 components)
20.000 MW of battery storage located at Macclesfield. (2)
Lower Road, Brentwood, CM13 1BZ (1 component)
New Build Generation CMU, advanced battery energy storage system
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (2 components)
1.200MW of battery storage located at Durham. (2)
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (1 component)
1.200MW of battery storage located at Durham.
Lascar Works, Tanpits Road, Bury, BL9 5BY (2 components)
20.000MW of battery storage located at Lascar Works (2)
Lascar Works, Tanpits Road, Bury, BL9 5BY (1 component)
20.000MW of battery storage located at Lascar Works
Larport Farm Larport Lane Dormington Hereford HR1 4EP (3 components)
19.500 MW of battery storage located at Hereford. (2)
Larport Farm Larport Lane Dormington Hereford HR1 4EP (2 components)
19.500 MW of battery storage located at Hereford. (2)
Land North of Clayhill, Westoning, MK45 5JD. (3 components)
1.200MW of battery storage located at Westoning. (3)
Hungerford Farm, Winchfield, Hook, RG27 8SW (2 components)
1.200MW of battery storage located at Hook. (2)
Hungerford Farm, Winchfield, Hook, RG27 8SW (1 component)
1.200MW of battery storage located at Hook.
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (2 components)
1.000MW of battery storage located at Staffordshire. (2)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (1 component)
1.000MW of battery storage located at Staffordshire.
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (2 components)
1.200MW of battery storage located at Preston. (2)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (2 components)
1.200MW of battery storage located at Preston. (2)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (1 component)
1.200MW of battery storage located at Preston.
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (1 component)
1.200MW of battery storage located at Preston.
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (2 components)
0.400MW of battery storage located at Stratford-Upon-Avon. (2)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (1 component)
0.400MW of battery storage located at Stratford-Upon-Avon.
Cleveland Potash Ltd, Boulby Mine, Loftus, Saltburn TS13 4UZ (1 component)
Purpose Build Battery designed to be compliant in the FFR market.
Carlton, Stockton-on-Tees, TS21 1EA (2 components)
1.200MW of battery storage located at Stockton-on-Tees. (2)
Carlton, Stockton-on-Tees, TS21 1EA (1 component)
1.200MW of battery storage located at Stockton-on-Tees.
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (3 components)
0.800MW of battery storage located at Wiltshire. (3)
Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.
ChatGPT